Industrial Projects: Factory, Workshop, and Barracks Floors Made of ULTIMA PVC Tiles
4.9/5 on Google: over 340 customer reviews on our Mosaik Floor - PVC Tile Expert (Lyon) listing.
Four industrial projects completed using ULTIMA interlocking PVC tiles: an aircraft manufacturer, an EDF workshop, a fire station, and a production facility renovated in phases. For each project: the existing subfloor, the challenges, the product line installed, and the installation method used. The photos are from the job sites and were taken before and after installation.
DAHER, aircraft manufacturer: 500 m² of industrial floor space with severely damaged old tile flooring

| Client | DAHER, aircraft manufacturer |
|---|---|
| Location | Hautes-Pyrénées (65) |
| Area | 500 m² |
| Installed Lineup | ULTIMA INDUSTRY 7 mm, PURE grade, dark gray, with accent zones featuring red ULTIMA INDUSTRY PURE tiles (March 2022, 2 days, 4 installers) |
| Constraint | Old, heavily damaged hallway tile flooring; used by carts and pallet jacks carrying very heavy aircraft parts |
| Solution | Interlocking tiles installed over the existing tile floor; red interlocking sections embedded in the floor to delineate stations and aisles |
The production hall retains its original flooring: the tiles cover the floor and withstand traffic from carts and pallet jacks. Zone markings are made with red interlocking tiles and strips, not paint: they do not wear away under the wheels and can be repositioned if workstation layouts change. Full project details with before-and-after photos: DAHER project. For this type of facility, see industrial flooring.
EDF Hydro Est, maintenance workshop: 400 m² of checkerboard-pattern flooring installed without leveling compound on an existing floor

| Client | EDF Hydro East |
|---|---|
| Location | Haut-Rhin (68) |
| Area | 400 m² |
| Installed Lineup | ULTIMA ULTRA 10 mm, PURE quality, black and dark gray in a checkerboard pattern (November 2021, 3 days, 3 installers) |
| Constraint | Quick installation, without leveling, and without creating dust or disrupting workshop operations; frequent use of forklifts carrying very heavy loads; aging subfloor that generates dust; a need for comfort for teams who work standing up |
| Solution | Installed using a click-lock system directly over the existing floor, with no preparatory work required: the 10-mm tile traps dust from the subfloor, absorbs the impact of heavy loads, and provides comfort underfoot |
No leveling, no drying time: the workshop was outfitted without interrupting operations. The old floor remains in place beneath the tiles, which cover it and trap the dust it used to give off. Full project details with before-and-after photos: EDF Hydro Est project. For this type of space, see PVC workshop flooring.
SDIS 95, fire station: 300 m² of flooring installed for vehicles weighing 15 to 20 metric tons

| Client | SDIS 95, Val-d'Oise Departmental Fire and Rescue Service |
|---|---|
| Location | Val-d'Oise (95) |
| Area | 300 m² |
| Installed Lineup | ULTIMA ULTRA 10 mm, PURE quality, dark gray, with yellow ULTIMA zoning |
| Constraint | Fire trucks weighing 15 to 20 metric tons or more, both passing through and parked; old, deteriorating resin that was flaking off, making it impossible to bond in its current condition |
| Solution | Shot blasting to remove the resin and restore a clean, dry surface, followed by leveling, then installation of ULTIMA ULTRA PURE slabs to support the loads (December 2023, 2 installers, 3 days) |
This is the opposite of the previous two cases: here, the substrate could not be left as is. A resin that has reached the end of its service life does not accept adhesive; therefore, the floor was shot-blasted and then leveled before the adhesive installation. Adhesive installation is the standard practice whenever very heavy machinery operates on site. Details on when bonding is required: Is adhesive needed for PVC tiles? Complete report with photos of the three phases: SDIS 95 project. Description: warehouse floor at a fire station.
GERAL, Belley: Several hectares of production and storage facilities renovated in phases of 500 to 700 m²

| Client | GERAL |
|---|---|
| Location | Belley, Ain (01) |
| Area | A park covering several hectares, which has been maintained in sections ranging from 500 to 700 m² for several years |
| Installed Lineup | ULTIMA INDUSTRY 7 mm, PURE grade, smooth dark gray |
| Constraint | Fenwick pallet jacks are used daily in the production areas and storage zones; operations cannot be halted |
| Solution | Tiles were installed using an adhesive method; work was carried out section by section in the evenings and on weekends, with each area handed over for use before moving on to the next |
A long-term project: the site is being renovated zone by zone, in step with operations, using bonded slabs to withstand the daily traffic of the Fenwick forklifts. Report and before-and-after photos: the GERAL project in Belley.
Other Industrial Projects
- Hyper U Warehouse (Var, 83): 150 m² of MOSAIK CONFORT driving surfaces installed in a single day over heavily damaged tile flooring, without any leveling, between aisles traversed by heavily loaded forklifts (November 2026).
- Industrial manufacturing facility (Yonne, 89): 300 m² of smooth, dark gray and light gray 10-mm ULTIMA ULTRA tiles, clip-locked onto a heavily damaged old resin floor—which had been subjected to forklift traffic—by two installers in one and a half days (November 2026).
- Industrial site (Netherlands): 2,400 m² of 7-mm light gray and dark gray ESD PVC flooring installed in 10 days over worn concrete, with conductive tape and a video of the construction site (September 2025).
- Mercedes-Benz (Germany): 2,000 m² of 7-mm dark gray ESD PVC flooring with yellow edging and ESD markings, installed in a vehicle preparation hall in July 2025 by a team of six people.
- Poyet Motte, Cours-la-Ville (69): A 2,000 m² factory and warehouse built with ULTIMA ULTRA panels, installed in one week on severely damaged ground, with before-and-after photos.
- Rosenbauer (69): 1,500 m² of light gray ULTIMA INDUSTRY, fully bonded, in a fire truck repair shop.
- Copadex (45): 250 m² of dark gray ULTIMA INDUSTRY flooring installed in a single day over damaged concrete in a tire warehouse with forklift traffic.
- EXOTEC (59): 600 m² of assembly line in light gray and yellow ULTIMA INDUSTRY.
- Hiolle Technologies (59): 920 m² of MOSAIK INTENSE driving surfaces under forklifts.
What these construction projects have in common
An existing floor that is damaged, stained, dusty, tiled, or coated with resin; heavy rolling loads; a site that cannot be shut down for long periods. In all cases, the solution is an ULTIMA PVC tile in PURE grade: 7 mm (INDUSTRY) for carts and pallet jacks, 10 mm (ULTRA) for the heaviest loads, glued down for heavy-duty use, with floor markings using colored tiles. Substrate preparation depends on its condition: direct installation on sound or slightly damaged concrete or tile; bonding for intensive daily traffic; shot blasting and leveling over chipped resin or oil-soaked concrete. Have a similar project? Request a quote—we’ll respond within 24 hours. Guides: warehouse flooring, heavy-duty industrial flooring, industrial flooring in France, by the numbers. All our documented projects: our portfolio.
Information provided by MOSAIK-FLOOR regarding its own construction sites, updated on October 27, 2026.
-
24/7 CUSTOMER SERVICE
If you have any questions about our products or your order, please do not hesitate to contact us. Please do not hesitate to contact us.
-
SECURE PAYMENTS
Our online payments are 100% secure. Payment by Visa, Mastercard or Paypal in 1 or 4 free instalments.
-
FAST DELIVERY
We deliver anywhere in Europe and our lead times are 2 to 3 weeks. We take great care to meet these deadlines.
-