A 2,000-square-meter factory and warehouse renovated in one week using ULTIMA ULTRA slabs

  • Client: Poyet Motte
  • Industry: Manufacturing
  • Area: 2 ,000 m²
  • Location: Cours-la-Ville , Rhône (69)
  • Completion date: July 2022
  • Timeframe: 1 week, 4 installers
  • Service: Supply and installation of MOSAIK-FLOOR
  • Substrate condition: Severely damaged concrete , partially patched

Constraints

  • Heavily Damaged Floor in a 200-Year-Old Factory
  • Heavy traffic of Fenwick forklifts between the storage racks
  • 2,000 m² to be treated in one week

Solution

  • Partial repair of the most damaged areas
  • ULTIMA ULTRA 10 mm smooth PURE dark gray tiles, PURE yellow section
  • Tiles glued to the aisles between the racks where the Fenwick forklifts operate

In brief: Poyet Motte, a 200-year-old factory in Cours-la-Ville (Rhône), renovated 2,000 m² of warehouse and workshop space in July 2022 using 10-mm-thick, smooth ULTIMA ULTRA PURE tiles in dark gray and yellow. Four MOSAIK-FLOOR installers completed the project in one week, following a partial leveling of the heavily damaged floor, with the tiles adhered to the aisles where the Fenwick forklifts operate.

Poyet Motte after installation: production workshop for dark gray ULTIMA ULTRA PURE slabs
Poyet Motte Before Renovation: Production Facility with Worn and Stained Concrete

The Initial Need

Poyet Motte operates a 200-year-old factory in Cours-la-Ville, in the Rhône region. Over the decades, the flooring in the warehouse and workshops had deteriorated significantly: cracked and chipped concrete, peeling old floor paint, and holes in the aisles where forklifts travel. They needed to renovate 2,000 m² quickly, with a floor capable of withstanding the daily traffic of Fenwick forklifts moving between the racks.

The Selected Solution

The most damaged areas were first partially leveled. The 10-mm-thick, smooth ULTIMA ULTRA tiles in dark gray PURE were then installed over the entire floor, with a section in yellow PURE framed by dark gray. In the warehouse aisles, where forklifts move between the racks, the tiles were glued down to withstand heavy traffic; elsewhere, they were interlocked. A team of four MOSAIK-FLOOR installers completed the 2,000 m² project in one week in July 2022.

Before, After

The before-and-after photos in the gallery show the transformation in three areas: the rack aisle, the loading dock, and the production workshop. A uniform, clean, and bright floor replaces the worn-out concrete—without any demolition.

Photos from the construction site

Floor in front

Poyet Motte before renovation: heavily damaged warehouse floor, with paint and concrete peeling off
Poyet Motte before construction: cracked and chipped concrete at the dock
Poyet Motte Before Renovation: Production Facility with Worn and Stained Concrete

Floor after

Poyet Motte: A row of racks made of bonded ULTIMA ULTRA slabs designed for use with Fenwick forklifts
Poyet Motte after installation: loading dock made of dark gray ULTIMA ULTRA slabs
Poyet Motte: Production facility for dark gray ULTIMA ULTRA PURE slabs
Poyet Motte: warehouse, rack aisles, and workshop with dark gray ULTIMA ULTRA slabs

This Project by the Numbers

  • 2,000 m² of 10-mm ULTIMA ULTRA tiles, or approximately 8,000 50 x 50 cm tiles
  • 1 week of installation, 4 MOSAIK-FLOOR installers
  • Tiles are glued down in the Fenwick aisles and snapped into place elsewhere
  • A factory that has been in operation for two hundred years

Frequently Asked Questions About This Construction Project

Can PVC tiles be installed on a severely damaged factory floor?

Yes, after proper preparation: at Poyet Motte, the most damaged areas were partially leveled before the ULTIMA ULTRA tiles were installed over the 2,000 m².

Should the tiles be glued down where forklifts operate?

In the aisles where Fenwick forklifts move and turn between the racks, adhesive installation is recommended to withstand heavy traffic. Elsewhere, the tiles can remain clip-mounted.

How long does it take to install 2,000 m²?

One week with a team of four MOSAIK-FLOOR installers, including partial leveling.

How many slabs are needed for 2,000 m²?

Approximately 8,000 ULTIMA ULTRA tiles measuring 50 x 50 cm, with each tile covering 0.25 m², plus cutting scraps.

Products Used

Do you have a similar project?

Factory, warehouse, or logistics hub: check out the ULTIMA ULTRA tile, the pages on warehouse flooring and industrial flooring, the comparison of PVC, resin, concrete, and tile, the guide on whether to install PVC tiles with adhesive, our industrial projects, and all our documented job sites. For a quote: request a quote.

See also: the SDIS 95 fire station and the EDF Hydro Est workshop, both of which are also built with ULTIMA ULTRA.

Updated on October 20, 2026.

← All Projects