Use Cases
Renovated workshops and storage space
- Client: GERAL
Industry: Manufacturing
Area: Several hectares, with plots ranging from 500 to 700 m²
Location: Belley , Ain (01)
- Date of completion: For several years now
- Starting surface: Existing floors to be renovated, including tile flooring
Constraints
- Daily use of Fenwick pallet jacks
- No interruption of operations is possible during construction
- Existing floors to be renovated, including tile floors
Solution
- ULTIMA INDUSTRY PURE dark gray slabs, bonded to the substrate and fully integrated with it to withstand rolling loads
- Construction work carried out in the evenings and on weekends, one wall at a time, covering 500 to 700 m²
- Installation over the existing tile flooring, which was left in place
In brief: For several years now, MOSAIK-FLOOR has been gradually renovating the floors at the GERAL site in Belley, in the Ain department: a facility spanning several hectares, with areas ranging from 500 to 700 m² covered with dark gray ULTIMA INDUSTRY PURE PVC tiles that are glued down to withstand the daily traffic of Fenwick pallet jacks. Client requirement: Work must be carried out in the evenings and on weekends to ensure operations are never interrupted.
Photos from the construction site
This Project by the Numbers
- Facilities: Work and production rooms, storage areas
- Time frame: Over the past several years, in successive phases
- A park covering several hectares that is undergoing gradual restoration
- Surfaces ranging from 500 to 700 m² per phase, or approximately 2,000 to 2,800 50 x 50 cm slabs per phase
- Daily use of Fenwick pallet jacks
- Adhesive installation, service calls in the evenings and on weekends
Frequently Asked Questions About This Construction Project
Is it possible to renovate a factory floor without halting production?
Yes. At GERAL, the several-hectare orchard is being restored in sections of 500 to 700 m², with work carried out in the evenings and on weekends; each section is returned to production before work begins on the next one.
Why glue PVC tiles instead of snapping them together?
When Fenwick pallet jacks are in use every day, adhesive bonding ensures that the floor remains firmly attached to the subfloor under rolling loads and during braking. For lighter traffic, a clip-on installation is sufficient.
Which PVC flooring is best for production facilities and storage areas?
The ULTIMA INDUSTRY 7 mm tile in PURE quality, shown here in smooth dark gray: a uniform floor surface from one section to the next, resistant to wheeled traffic and easy to maintain.
Can PVC flooring be installed over existing tile?
Yes: At GERAL, the slabs are laid over the existing tile flooring, which remains in place. For adhesive installation, the subfloor must be clean, dry, and stable.