A complete line featuring a wide variety of attractive and durable designs to enhance the ambiance of your spaces.
- Glued Floors
- Snap-together flooring
- Sloping floors
COMPARISON
Glued, clipped, or weighted: What's the difference?
All three product lines feature wood and stone designs. What sets them apart is how the flooring is installed: the preparation it requires, and how easy it is to install and repair.
| Glued-down flooringAdhesive installation | Click-together flooringFloating installation | Floor-mounted installationSealed installation | |
|---|---|---|---|
| Principle | Glued directly onto the backing | Floating installation — the planks connect via a click system and rest freely on the subfloor | Held in place by its own weight and a lightweight fastening material: tack adhesive, adhesive primer, or a specialized adhesive, depending on the surface |
| Implementation | Properly prepared surface, adhesive drying time | Quick installation, no adhesive required—works even on less-than-perfect surfaces. Perimeter expansion joint | Lightweight, temporary fastening |
| Removal | Destructive | No damage | Each element is lifted and set back down —the existing floor remains accessible |
| Repair | The damaged blade is cut out with a plunge saw and then replaced | Unclip the panels all the way to the slat if it's close to a wall; otherwise, cut it to size. | The tile lifts up and is replaced directly —the easiest to repair |
| Heated Floor | Compatible — provides the best heat transfer | Compatible — provides slightly better insulation; minimum 5 mm gap around the perimeter | Compatible |
| Thickness | 2.5 mm | 5 mm | 4.5 mm |
| Formats | Slab · rectangular slab · square slab | Blade · Rectangular slab | Slab · rectangular slab · square slab |
| The right choice for | High-traffic areas: the only installation method that meets the highest usage classes | Quick installation and removal, without glue | Premises where work must be performed under the flooring or where a tile must be replaced without interrupting operations |
| Discover: Glued Flooring | Discover: Clip-on Floor | Discover: Lead-weighted floor |
Glued-down flooring
Adhesive Installation
- Principle
Glued directly onto the backing
- Implementation
Properly prepared surface, adhesive drying time
- Removal
Destructive
- Repair
The damaged blade is cut out with a plunge saw and then replaced
- Heated Floor
Compatible — provides the best heat transfer
- Thickness
2.5 mm
- Formats
Slab · rectangular slab · square slab
- The right choice for
High-traffic areas: the only installation method that meets the highest usage classes
Snap-on base
Floating installation
- Principle
Floating installation — the planks connect via a click system and rest freely on the subfloor
- Implementation
Quick installation, no adhesive required—works even on less-than-perfect surfaces. Perimeter expansion joint
- Removal
No damage
- Repair
Unclip the panels all the way to the slat if it's close to a wall; otherwise, cut it to size.
- Heated Floor
Compatible — provides slightly better insulation; minimum 5 mm gap around the perimeter
- Thickness
5 mm
- Formats
Blade · Rectangular slab
- The right choice for
Quick installation and removal, without glue
Weighing down the floor
Weighted Pose
- Principle
Held in place by its own weight and a lightweight fastening material: tack adhesive, adhesive primer, or a specialized adhesive, depending on the surface
- Implementation
Lightweight, temporary fastening
- Removal
Each element is lifted and set back down —the existing floor remains accessible
- Repair
The tile lifts up and is replaced directly —the easiest to repair
- Heated Floor
Compatible
- Thickness
4.5 mm
- Formats
Slab · rectangular slab · square slab
- The right choice for
Premises where work must be performed under the flooring or where a tile must be replaced without interrupting operations
Regardless of the installation method, the subfloor must be hard, clean, dry, and level: no more than 2 mm of unevenness when measured with a 2-meter straightedge. If the unevenness exceeds this, the subfloor must be leveled. Not sure about your project? Request a quote, and we’ll help you choose the right installation method.