Sol d'entrepôt en dalles PVC dans une caserne de pompiers

Flooring for a fire station warehouse

  • The challenge : to install a floor that can withstand the frequent passage of 20-tonne fire trucks.
  • Date: November 2024
  • Services: supply and installation of PVC tiles + removal of existing resin.
  • Surface area: 300 m²
  • Product: Ultima dark grey and yellow 7mm tiles 

To achieve this, the tiles had to be glued. However, the substrate was an old resin that was crumbling.

Our team therefore removed the existing resin to obtain a porous concrete substrate that would allow the adhesive to adhere well.

Once the floor was clean, we glued the tiles in place, respecting the required signage.

The result is a success, and our customers are satisfied.

Avant photos

Sol d'entrepôt de caserne de pompiers avant travaux

Pictures After 

Sol d'entrepôt de caserne de pompiers après pose des dalles

Video of the 3-day operation below.